Project: Garden Office Base Between Two Hedges - Stepaside, October 2026
- Location: Stepaside, Dublin 18 (Residential Back Garden)
- Project Type: Concrete foundation for a garden office
- Size: 15′ x 17′
- Key Feature: A large slab at the end of the garden, boxed in by a tall hedge and a row of conifers
The Challenge: A Garden Office Is Not a Shed
At 15′ x 17′, this was a lot more ground than the average shed base. And a garden office gets used every day, with a desk, a chair and a laptop in it, so a damp floor or a slab that sits slightly off level just isn’t an option.
The spot was the far end of the garden. Tall hedge at the back, conifers down the right-hand side, and none of it was getting cut back.
The Solution: Formwork First, Then the Membrane
Same method we use on every concrete base:
- Dig out and sub-base: the ground was dug out and a compacted 804 hardcore sub-base went in.
- Formwork: timber formwork was set out square, sized to the office footprint.
- DPM: the damp proof membrane (DPM) went down in overlapping sheets across the full area. That’s the black layer you see in the photo.
The Result: A Big, Flat Slab Ready for the Office
The concrete was poured over the membrane and levelled inside the formwork. Put the two photos side by side: same corner of the garden, before and after the pour. The hedges haven’t lost a branch.
Project Technical Specs:
- Base Type: Concrete slab
- Size: 15′ x 17′
- Sub-base: Compacted 804 hardcore
- Protection: DPM
- Built for: Garden office
Project: Sheds Direct Metal Shed Base on Gravel - Walkinstown, October 2026
- Location: Walkinstown, Dublin 12 (Residential Back Garden)
- Project Type: Concrete foundation for a Classic metal shed from Sheds Direct Ireland
- Size: 7′ x 9′
- Key Feature: Corner base in a gravel garden, between a concrete wall and a slatted timber fence
The Challenge: A Metal Shed Wants a Perfectly Square Base
No lawn in this garden. Just loose gravel, right up to the walls.
The customer had ordered a Classic metal shed from Sheds Direct Ireland, and metal sheds are fussy about what they sit on. If the base is out of square or off level, the panels won’t line up and the doors end up dragging. The shed was going into the corner, against a bare concrete wall on one side and a new slatted fence on the other.
The Solution: Tight Into the Corner
Same method we use on every concrete base:
- Dig out and sub-base: the gravel was cleared back, the ground dug out and a compacted 804 hardcore sub-base went in.
- Formwork: timber formwork was set tight into the corner, square to the wall and the fence.
- DPM: the damp proof membrane went in over the hardcore before the pour.
The Result: Sized to the Shed’s Footprint
The 7′ x 9′ slab now fills the corner, with the gravel running right up to the formwork. Level, square and the right size for the shed, so the Sheds Direct kit can go straight on top.
Project Technical Specs:
- Base Type: Concrete slab
- Size: 7′ x 9′
- Sub-base: Compacted 804 hardcore
- Protection: DPM
- Built for: Classic metal shed, Sheds Direct Ireland
Project: Reinforced Base for a Glass Pergola - Skerries, September 2026
- Location: Skerries, Co. Dublin (Residential Back Garden)
- Project Type: Concrete foundation for a glass pergola
- Size: 16′ x 18′
- Key Feature: Steel reinforcement mesh over the DPM, between a paved patio and a block retaining wall
The Challenge: No Shed This Time
This customer was putting up a glass pergola, not a shed. At 16′ x 18′, it was the biggest base in this batch of jobs.
The area sat between the paved patio and a low block retaining wall, so the edges had to finish clean against both. A slab that wide also has more room to crack than a small shed pad.
The Solution: Steel Mesh Before the Pour
The usual groundwork, with one extra step:
- Dig out and sub-base: the ground was dug out and a compacted 804 hardcore sub-base went in.
- Formwork and DPM: timber formwork was set out along the patio and the wall, then the damp proof membrane went in.
- Reinforcement: steel reinforcement mesh was laid over the membrane, so the concrete has steel running through it once it’s poured.
The Result: A Wide Slab With Steel Inside
The concrete was poured over the mesh and levelled inside the formwork, giving the pergola a solid 16′ x 18′ footing. The patio around it stayed as it was.
Project Technical Specs:
- Base Type: Reinforced concrete slab
- Size: 16′ x 18′
- Sub-base: Compacted 804 hardcore
- Protection: DPM
- Reinforcement: Steel mesh
- Built for: Glass pergola
Project: End-of-Garden Base Against a Painted Wall - Clontarf, August 2026
- Location: Clontarf, Dublin 3 (Residential Back Garden)
- Project Type: Concrete foundation for a garden shed
- Key Feature: Base along the back boundary wall, reached by a stepping stone path across the lawn
The Challenge: Keeping the Lawn and the Path Intact
The shed was going at the far end of the garden, against the painted block wall at the back. Between the house and that spot there was a lawn and a stepping stone path, and both were staying where they were.
So the base had to go in without turning the garden into a building site, and it had to line up with the wall rather than sit at an odd angle to it.
The Solution: A Straight Base Along the Wall
Same method we use on every concrete base:
- Dig out and sub-base: the ground was dug out and a compacted 804 hardcore sub-base went in.
- DPM: a damp proof membrane went over the hardcore before the pour.
- Formwork and pour: the timber formwork ran parallel to the wall, and the concrete was poured and levelled inside it.
The Result: A Base That Belongs at the End of the Garden
The base runs along the wall at the end of the lawn, and the stepping stones now lead straight up to it. The lawn around it is untouched.
Project Technical Specs:
- Base Type: Concrete slab
- Sub-base: Compacted 804 hardcore
- Protection: DPM
- Setting: Against a painted block boundary wall, on a lawn with a stepping stone path
Project: Corner Base in a Finished Garden - Clontarf, July 2026
- Location: Clontarf, Dublin 3 (Residential Back Garden)
- Project Type: Concrete foundation for a garden shed
- Key Feature: Corner base against timber fencing, beside artificial grass and porcelain paving
The Challenge: Working Around a Finished Garden
This garden was already done: artificial grass, porcelain paving and timber fencing on two sides. The shed was going into the back corner, so the base had to sit tight into the corner, square to both fences, right next to surfaces that had to come out of the job looking the same as before.
The Solution: A Clean Pour Inside Timber Formwork
Same method we use on every concrete base:
- Dig out and sub-base: the ground was dug out and a compacted 804 hardcore sub-base went in.
- DPM: a damp proof membrane went over the hardcore before the pour.
- Formwork and pour: the timber formwork was set square to both fence lines, with the artificial grass and the paving left untouched right up to the boards.
The Result: A Square Base That Fits the Corner
The base fills the corner neatly, square to both fences and alongside the paving, ready for the shed once the concrete has cured.
Project Technical Specs:
- Base Type: Concrete slab
- Sub-base: Compacted 804 hardcore
- Protection: DPM
- Setting: Corner against timber fencing, beside artificial grass and porcelain paving
Project: The Corner Fit - Shed Base & Drainage Management - Dublin, March 2026
- Location: Dublin 18 (Residential Back Garden)
- Project Type: Foundation for a multi-purpose timber shed
- Key Feature: Corner geometry with decorative fencing and integrated drain access
The Challenge: Drainage and Decorative Fencing
This project was a classic Dublin suburban challenge. The customer wanted their shed tucked into a specific corner that featured decorative concrete fence panels and, more importantly, a surface water drain.
You cannot simply build over a drain cover or block the natural runoff of a garden corner. The base needed to be perfectly angled to allow for water drainage while remaining level for the shed itself.
The Solution: Custom Groundwork in Tight Quarters
We spent extra time on the survey phase for this one.
- Strategic Placement: We positioned the base to ensure full access to the existing drainage pipework while maximizing the useable corner space.
- Sub-base Engineering: We used a depth of 200mm of compacted 804 hardcore in this corner to account for the proximity to the drainage trench and ensure the soil wouldn’t settle unevenly.
- Finish & Flow: The concrete was screeded with a micro-fall away from the decorative fencing. This ensures that during a heavy Dublin downpour, water doesn’t pool against the base of the shed or the fence posts.
The Result: A Smart, Integrated Foundation
The base looks like it was always part of the garden design, fitting snugly between the decorative panels. The customer now has a rock-solid foundation that respects the garden’s existing infrastructure and will keep their shed level for decades.
Project Technical Specs:
- Base Type: Reinforced Concrete Slab
- Sub-base: 200mm Clause 804 Hardcore
- Protection: PVC Weed membrane & DPM
- Drainage: Integrated surface water bypass
Satisfied Customers
Project: Space-Saving Concrete Base Against Boundary Wall - Dublin, February 2026
- Location: South Dublin (Residential Estate)
- Project Type: Permanent concrete foundation for a storage shed
- Key Feature: Flush-wall placement to maximize garden space
The Challenge: Maximizing Every Inch
In many Dublin back gardens, space is at a premium. For this project, the homeowner wanted a solid storage shed but didn’t want it sitting in the middle of their lawn. The plan was to tuck it right up against the existing block boundary wall.
The technical difficulty here is ensuring the excavation doesn’t undermine the wall and that the levels are perfect so water doesn’t pool between the shed and the masonry.
The Solution: A Precise Structural Pour
We cleared the area and began the groundwork. In Dublin, you’re usually dealing with clay soil that can shift, so we went deep on the sub-base.
- Ground Preparation: We excavated and laid 150mm of certified 804 hardcore. This was compacted using a whacker plate until it provided a structural, non-shifting platform.
- Formwork: We set up timber shuttering on the open sides to contain the pour, ensuring the base remained perfectly square.
- Concrete Pour: We used a high-spec C20 concrete mix, screeded to a smooth plate finish. We kept the height slightly above the surrounding grass level to prevent water ingress during typical Dublin downpours.
The Result: A Clean, Space-Efficient Base
The finished pad is solid, level, and ready for a lifetime of use. By building flush against the wall, we saved the homeowner nearly a metre of garden width compared to a standard standalone placement.
Project Technical Specs:
- Dimensions: 2.5m x 2.0m
- Depth: 150mm concrete on 150mm 804 stone
- Finish: Smooth screed
- Access: Side gate wheelbarrow access
Project: Maximum Quality - The Precision Pour & Shuttering - Dublin, February 2026
- Location: Carrickmines, Dublin 18 (South Dublin)
- Project Type: High-strength concrete base for a large garden building
- Key Feature: Professional timber formwork and full DPM protection
The Challenge: Maximizing Every Inch
The biggest enemy of a garden shed in Ireland isn’t the rain – it’s ground moisture. For this project, the customer had a high-end timber shed on order. Without a proper barrier, moisture from the Dublin clay would rise through the concrete and rot the floor joists within years.
The goal here was to demonstrate a “no-shortcuts” installation: perfect levels, a structural sub-base, and a non-negotiable damp proof membrane.
The Solution: The Professional Process Step-by-Step
We didn’t just dump concrete on the ground. We followed our strict 5-step process:
- Precision Shuttering: We built custom timber formwork to provide a perfectly square and straight edge. This isn’t just for looks – it ensures the shed sits exactly where it should without any dangerous overhang.
- Moisture Protection (DPM): We laid a heavy-duty Damp Proof Membrane (the black layer visible in our process shots). This creates a watertight barrier between the soil and the concrete slab.
- The Wet Pour: We used a durable C20 concrete mix. While the concrete was wet, we screeded it back and forth to ensure a perfectly level surface. In a garden with a slight slope, this precision is what makes the difference during shed assembly.
The Result: A Foundation Built for Decades
By the time the concrete was screeded, the base was level to within 2mm across the entire span. This professional groundwork ensures the shed doors will never jam and the floor will stay dry for the next 20+ years.
Project Technical Specs:
- Base Material: C20 Concrete (Wet Pour)
- Formwork: 4×2 pressure-treated timber shuttering
- Barrier: 1200-gauge polyethene DPM
- Sub-base: 150mm compacted 804 aggregate